Denver’s bungalows, ranches and split-levels are mostly pre-1978, and so is most of the metro’s HUD inventory. Lead-based paint is assumed in any of them. HUD handles it more carefully than a private seller does, and you sign more paper.
What HUD does before you close
- HUD orders a lead-based paint inspection on pre-1978 homes as part of its property review. The report is in the listing documents.
- On homes sold with FHA financing, HUD stabilizes defective paint surfaces (scraping, priming, repainting the peeling areas) before closing, using a certified contractor, and provides a clearance report. This is the most common reason a HUD closing waits on HUD, and HUD-caused delay means a free extension. Ask for it.
- On cash and non-FHA sales, HUD discloses but does not stabilize. The house is yours as-is.
What you sign
- The federal lead-based paint disclosure and the EPA pamphlet “Protect Your Family From Lead in Your Home.”
- HUD’s lead-based paint addendum, which records the inspection results and either the stabilization HUD will do or your acknowledgment that it will not.
Your 10-day right
Federal law gives every buyer of a pre-1978 home a 10-day window to hire a certified lead risk assessor. On a HUD home that window runs inside the 15-day inspection period. A risk assessment costs $300 to $600 in the Denver area. If it finds hazards HUD did not, HUD will not do more than the addendum says. An owner-occupant who cancels for the finding forfeits half the deposit, unless the lender denies the loan because of it. The refund rules.
If you have children under six
Take the 10 days. Pay for the assessment. Windows, doors and porches are where the dust is. Stabilization makes a house safe to occupy; it does not remove the lead. Budget for window replacement if the sashes test positive and you have small kids.
Renovating later
Any contractor disturbing paint in a pre-1978 home must be EPA RRP certified and follow lead-safe practices. If you are doing a 203(k) or a HomeStyle, the contractor bid should say so. Renovation loans.
A plain-English example
A 1954 ranch in Englewood, FHA buyer. HUD’s inspection found defective paint on the exterior window trim and the garage door. HUD’s contractor stabilized both in week three and delivered a clearance report. The buyer’s own risk assessor found dust on the interior sills, which the buyer cleaned and later replaced. HUD granted a 12-day no-fee extension because the clearance ran past day 45.
Not sure which rule applies to the house you are looking at? Call or text 303-955-4220. A live person answers, and the answer is free.
Free guide, PDF
The Colorado HUD Home Buyer's Playbook
How HUD bidding really works, the nine ways buyers lose, and the bid worksheet. 18 pages, free.
Why you want it before you bid:
- The 15-day owner-occupant window, day by day, so you never miss a deadline
- The net-to-HUD math HUD actually scores, with a one-page bid worksheet
- The nine ways buyers lose a HUD home, and how each one is avoided

Find every home available, not just HUD homes
Advanced home search: every listing on the Colorado MLS, with the full filters, on kennarealestate.com.
Opens kennarealestate.com, the Kenna Real Estate Group’s full MLS search. HUD homes only? Use the tiles and the map on this site.
Ask us about HUD homes
Tell us what you are working with and we will tell you honestly whether a HUD home is the way to get there. No cost, no obligation, and nobody sells you anything.
Call or text 303-955-4220
A live person answers. Not a robot, not a phone tree.


